Takt Time
The maximum time available to produce a single unit while still meeting customer demand โ net available working time divided by customer demand quantity.
TaktCustomer Demand RhythmCustomer Pull PacePace Time
Takt Time comes from the German word 'takt' (musical beat, rhythm) and expresses the synchronisation of a production system with the customer demand rhythm. Its calculation is straightforward: Takt = Net Working Time / Customer Demand Quantity (over the same period). For example, in an 8-hour shift (480 minutes) with 96 units of demand, Takt = 480/96 = 5 minutes/unit. Meaning: on average one unit must come off the line every 5 minutes. Takt is conceptually distinct from cycle time and throughput: cycle time is the actual processing time at a station, throughput is the actual output rate of the system, while takt is the target rhythm imposed by the customer. The core lean discipline: every station's cycle time must be less than or equal to takt. Otherwise a bottleneck and delivery delays form. Takt is the fundamental input to the assembly line balancing problem โ assigning work to stations is exactly distributing capacity under the takt ceiling. A taktโcycle-time chart ('Yamazumi chart') visualises in SMBs how work is distributed. When a line designed to takt is balanced, residual capacity (idle time) surfaces; this capacity is read as 'visible waste' for kaizen improvements directly from the Yamazumi chart. If demand is seasonal, takt is recomputed dynamically (e.g., high-season takt = 4 min, low-season = 7 min). References: Rother and Shook 'Learning to See' (1999); Ohno (1988); the ISO 22400-2 standard.
รrnek
An SMB producing plastic injection-mould parts in Eskisehir runs one 450-minute net-time shift per day, with customer demand of 75 parts per day. Takt = 450/75 = 6 minutes/part. On the current line, the cycle times of 5 stations are 4.2 / 5.8 / 6.4 / 5.1 / 3.9 minutes respectively. The third station (6.4 min) exceeds takt โ it is the bottleneck. The firm splits this station into two parallel machines or redistributes work to bring its cycle time down to 5.5 min; the line then becomes takt-feasible.